The technical and economic evaluation of the feasibility of an underground construction should involve not only geological, geotechnical and technological aspects but also the factors related to the interferences of the construction procedures and techniques with the population and with the environmental components of the site. The paper, through the use of the Analytic Hierarchy Process, compares two different excavation alternatives, microtunnelling and trench excavation, for an urban sewer construction project
Microtunnelling or trench excavation: a comparison of the two alternatives / Peila, Daniele; Bottero, MARTA CARLA. - STAMPA. - 1:(2005), pp. 21-26. (Intervento presentato al convegno 31st ITA-AITES World Tunnel Congress tenutosi a Istanbul (TUR) nel 7-12 May 2005).
Microtunnelling or trench excavation: a comparison of the two alternatives
PEILA, Daniele;BOTTERO, MARTA CARLA
2005
Abstract
The technical and economic evaluation of the feasibility of an underground construction should involve not only geological, geotechnical and technological aspects but also the factors related to the interferences of the construction procedures and techniques with the population and with the environmental components of the site. The paper, through the use of the Analytic Hierarchy Process, compares two different excavation alternatives, microtunnelling and trench excavation, for an urban sewer construction projectPubblicazioni consigliate
I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.
https://hdl.handle.net/11583/1415535
Attenzione
Attenzione! I dati visualizzati non sono stati sottoposti a validazione da parte dell'ateneo