This study presents a procedure, called EICS (Enterprise IPPC Compatibility Study) aimed at evaluating, by means of the calculation of three indexes, the compliance of the processes performed in an industrial plant with the guidelines provided by BREFs (BAT References) Documents. In fact, according to European Directive 2010/75/EU (concerning the Integrated Pollution Prevention and Control and repealing European Directive 2008/01/EC), industrial plants must require authorizations to the competent authority stating the conformity of their activity, in order to obtain this conformity they are advised to Best Available Technologies (BAT). The aim of the BATs is to avoid or minimize the impact of an industrial activity on the environment through the prevention of the atmospheric emissions, wastewater discharge and energetic consumption, and the correct waste management thus improving the efficiency of the plant. The procedure shown in the present paper has been tested on several types of industrial plant (cement plants, secondary smelt foundries, paper-mill, and automotive industries as regards their paint lines). In this paper, the application of EICS method to a cement plant is presented: the obtained results highlight a good correlation between the index values and the real situation of the plant.

A Standardized Procedure for a Pre-evaluation of the IED Instance / Panepinto, Deborah; Ruffino, Barbara; Zanetti, Mariachiara; Genon, Giuseppe. - In: ENVIRONMENTAL MANAGEMENT. - ISSN 0364-152X. - STAMPA. - 57:4(2016), pp. 847-855. [10.1007/s00267-016-0657-7]

A Standardized Procedure for a Pre-evaluation of the IED Instance

PANEPINTO, DEBORAH;RUFFINO, BARBARA;ZANETTI, Mariachiara;GENON, Giuseppe
2016

Abstract

This study presents a procedure, called EICS (Enterprise IPPC Compatibility Study) aimed at evaluating, by means of the calculation of three indexes, the compliance of the processes performed in an industrial plant with the guidelines provided by BREFs (BAT References) Documents. In fact, according to European Directive 2010/75/EU (concerning the Integrated Pollution Prevention and Control and repealing European Directive 2008/01/EC), industrial plants must require authorizations to the competent authority stating the conformity of their activity, in order to obtain this conformity they are advised to Best Available Technologies (BAT). The aim of the BATs is to avoid or minimize the impact of an industrial activity on the environment through the prevention of the atmospheric emissions, wastewater discharge and energetic consumption, and the correct waste management thus improving the efficiency of the plant. The procedure shown in the present paper has been tested on several types of industrial plant (cement plants, secondary smelt foundries, paper-mill, and automotive industries as regards their paint lines). In this paper, the application of EICS method to a cement plant is presented: the obtained results highlight a good correlation between the index values and the real situation of the plant.
File in questo prodotto:
Non ci sono file associati a questo prodotto.
Pubblicazioni consigliate

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/11583/2646110
 Attenzione

Attenzione! I dati visualizzati non sono stati sottoposti a validazione da parte dell'ateneo